So make sure that you read this section carefully. How to Build Stairs | A simple way to mark and cut stringers Install a piece of blocking below the rim joist to extend the attachment surface for your stairs stringers. First of all, for the stringers to comply with the Australian building code, all steps must be the same height. Prefabricated Stringers. )The system is delivered to your steps ready for installation with no more than minor leveling adjustments needed. In addition to be maintenance free, they give a finishing touch to your patio. Divide the height of the stairs by the desired rise. Attach a stair angle at each tread on the open stringers. Once all this is in place you can begin attaching the treads to the brackets. Can pick up the … Use a … Most steel staircases are manufactured in kit form and assembled on site in-situ. You will then need to either pour 2 small footings or cast a small slab (see our engineers’ details for footing size). Was a bit harder to create the "wall" for the stringer to fasten to but it's solid as a rock. Measure down from the top of the deck and mark the top of your stair stringers with a level. Bolts in a Bolt Kit (All Plated): Do the same with a bolt down set to ensure you do not have to re-bolt the stringers due to poor levelling. The LSCZ adjustable stair-stringer connector offers a versatile, concealed connection between the stair stringer and the carrying header or rim joist while replacing costly framing. Brisbane: 260 New Cleveland Road, Tingalpa, QLD 4173 (Entrance via Ingleston Road) Phone: (07) 3390 4656 Mobile: 0428 648 937, Toowoomba: 549 Boundary Road, Toowoomba, QLD 4350 Phone: (07) 4633 3623 Mobile: 0423 764 149, Deliver Australia wide at excellent rates. Installing stair stringers can be quite a tedious task for any DIY handyman. If you have treads over this length we recommend you purchase an extra stringer for centre support. Contact us with any questions. Then, mark the height of the connector. Use all specified fasteners; see table. For cast in, fill the footing with concrete and leave to set. Some things to consider during planning include the size of the stair stringer, layout, and installation. Install the stringers in their proper locations and fasten a stair angle at each tread location on the closed stringers. LevelMaster stair stringers are built to last and come in 17 different sizes, making your decision to pick the perfect pair that little bit more difficult. Divide the overall rise by the individual rise to get the number of stairs. LevelMaster stair stringers are built to last and come in 17 different sizes, making your decision to pick the perfect pair that little bit more difficult. Use 10d - 1.5" hot-dipped galvanized nails. Place each stringer in position with the top of the stringer at the mark made in the last step. The stair stringers are installed to run the length of the staircase. Get the stairs level front to back and side to side. Use a level to mark the top step. For both types, it is important that the top tread bracket is 225mm from the top of the deck. Also, the maximum recommended length of treads for a pair of our stringers is 1200mm. You should attach 2x6 or 2x8 support framing under the rim flush to the bottom of the stringer. Why raise a shearing shed with LevelMaster adjustable stumps. You should have a full set of stairs ready in to time. For bolt down, use M12 anchor screws to attach the base to the concrete landing. If you are confused at any stage of the process, please contact us. Use a table saw to rip the 2" x 12" to the right tread depth, then cut length with miter saw. If your first tread steps down from the deck, you must extend the rim joist to create a solid surface below the deck rim to attach it to. Bend your stair stringer connectors to the correct angle. Terms of use. Use positive connections to install stair stringers using stair stringer connectors to the front face of the rim to provide adequate support. Easy to install… You could use 2x2 cleats instead. Nail a riser on each upright face of the stringers – all the way down. Installation is usually a case of building up the stair in conjunction with the assembly drawings, bolting all sections together loose than then completing a methodical system of lining, levelling and tightening up all fixings. If there is already a concrete landing on the ground, then you will require a bolt down set. With a one-piece design, Peak's Steel Stair Stringers are easy to assemble, with no difficult cuts or separate stringers required. Stair stringers are the boards in a staircase that actually hold the stairs in place. Constructed from tubular steel and plate steel for the most safe and reliable design, these stringers are made to outlast the elements and provide durable performance. If the run slopes back, the bottom of the stringer needs to drop in relation to the top. There are a few things that you must do before you install stair stringers. Using stair angles on the open stringer provides an invisible connection. You can then refer to the table on the right to find exactly what size you’ll need (step count). Most wood stairs use 16" on center. Hold the connector under the stringer and raise the stringer to the proper height. If you have a cast in set, it is essential that both stringers are perfectly level and in line before pouring concrete (prop if necessary)—as you cannot undo this process. But if you take the time to do it properly, this will help you avoid any issues and master the process quickly. The Bilco SZ SL-SS (around $141) come coated in zinc, which galvanizes the steel … After recording this value, you must then decide whether you’ll require a bolt down set or a cast in set. Measure down from the top of the deck and mark the top of your stair stringers with a level. Check the center spacing of the stringers and install a tread on a step near the bottom to hold the stringers in the correct position. If your deck is 56 inches (140 cm) off the ground, … Nail the stair stringer connectors into place. All sizes ready in stock ready to ship. Attach the stringer to the framing with temporary screws and register all three stringers from the same attachment point. Steel stringers and aluminum stringers offer a better support, as they are extremely strong and durable. This means that you may need to dig the landing down a little extra or build it up to ensure that last step is 175mm. After they are correctly positioned, use M12 bolts to attach the top fixing bracket to the face of the deck structure (as shown). Contact Us Today for a free quote and measure or get a quote here. There are many ways to attach the tops of the stringers to the structure. Follow the manufacturer's guidelines for composite decking. The stairs will hang here. Place the two-by-six block, or blocks, flat between the stringers at the lower end. Firstly, attach the bolt down or cast in connector to the base of the stringer pair and position them to where you will need them to go later. The purpose of constructing a shearing s... Level Master © 2020 | All rights reserved | Website by, Design Files AutoCAD, SketchUp & ARCHICAD, Digital Level – Electronic Digital Spirit Level Device Tool. To do this, you must first measure the ‘height to deck’. So to ensure the job is done well, do it right. Install a piece of blocking below the rim joist to extend the attachment surface for your stairs stringers. Before we start talking about how to actually put the stringers into place, it’s important to make sure you know how to choose the exact right size and type of stringers for the job. Each wooden tread is mortised to receive metal brackets, which are laid out with a jig. If you currently have nothing, a cast in set would be ideal for you. The installation process will differ depending on what type of stringers you purchase. Field slopeable to all common stair stringer pitches, the LSCZ connector is suitable for either solid or notched stringers. 4) Bolt stringer to the side of the deck. Installation. Bolt the railing down to the deck and planks as required. Mark the location for each stair stringer. Step tread brackets and hardwood stair treads are also available to order. You should reinforce the rim behind the stairs to provide a solid base for attachment. A small but critical component, metal stringer brackets are designed to hold each stair tread in place. After you have finished your installation paint the stringers, bolts and railing with an enamel paint. But if you take the time to do it properly, … Rip 3/4" plywood on a table saw to the riser height and cut to the width of the stair. The center of the railing should set 3 � to 4 inches in from the edge of the planks. Each Viewrail FLIGHT is custom built with ease in mind for your individual project. Synopsis: Building steel-stringer stairs begins similarly to wooden stringers by determining rise and run, and calculating lengths and angles. Please remember: taking shortcuts while doing this can lead to some sticky situations. Hot-dip galvanised. (See table to confirm height.). Providing useful information and hints and tips about LevelMaster products and services. This means that there is no need for welding or fabrication on-site(What types of prefabricated stairs are there? By clicking GO!, you acknowledge that you have read Trex's Privacy Policy. Read the related article, Critical Deck Connections, or watch the rest of the video series below. Installation is facilitated by the holes already in place. Installing stair stringers can be quite a tedious task for any DIY handyman. Determining this is quite simple. The bracket must be securely fastened to both the steel mono stringer and the stair tread. For example, if each stair will be 6 3/8" finished height, we will measure down 7 3/8" to compensate for the missing stair tread. Stairs: The connection between stair stringer and deck comes down to a simple strap-style hanger, but locating and properly securing that hanger is where the bulk of the work will be focused. You can build a deck yourself. Because they ship pre-assembled, our metal stringers install quickly, allowing you to complete the project on your schedule. Underneath your railing, attach the U-shaped sleeve with the included … Metal Stringer Bracket. Steel and aluminum stringers. Copyright © 2021 Trex Company, Inc. All rights reserved. One easy way is to screw metal joist hangers to the floor joists or deck supports. This is the straight vertical height from the ground or concrete level at the bottom to the finished deck level at the top. Repeat for each stringer attachment. Looks nice and neat. The fastener that is installed into the bottom edge of the stringer must go into the second-to-last hole. Carpenter Josh Edmonds details the process, using step-by-step photographs and an illustration of the stringer layout. 3. Read more tips on deck building and attaching stair stringers to a deck. Deck Building 101: You Can Do It Yourself. Our friendly staff can help you out. Install the stringers. For cast in, ensure there is a hole excavated in this area for the footing to lie in. Very stable. Bilco SZ SL-SS. How you attach the stair stringers to the top of the deck and to any landings will be critical. Attaching Stair Stringers Since stringers carry the entire load of the stairs , they must be securely fastened at the top. Come with an adjustable bolt down or cast in attachment. Stair Stringer Installation Guide LevelMaster Stair Stringers are readily available in 1-17 tread sizes. Make sure the top of the stringers are level. Total Rise [A] - The total rise of a set of stairs is the vertical distance between the bottom of the first … Check the stringer for a level run. Most composite decking materials require 12" or even 10" on center spacing. Before fastening, position the stair stringer with the LSC on the carrying member to verify where the bend should be located. Popular areas: NSW: Sydney, Albury, Armidale, Ballina, Bathurst, Byron Bay, Coffs Harbour, Central Coast, Dubbo, Grafton, Lismore, Maitland, Newcastle, Orange, Port Macquarie, Tamworth, Wagga Wagga, Wollongong ACT: Canberra, Queanbeyan VICTORIA: Melbourne, Bendigo, Berwick, Ballarat, Geelong, Pakenham, Reservoir, Shepparton, Sunbury, Warragul QLD: Brisbane, South Brisbane, Bundaberg, Buderim, Cairns, Gladstone, Gold Coast, Gympie, Hervey Bay, Kingaroy, Logan City, Mackay, Maryborough, Mount Isa, Rockhampton, Sunshine Coast, Townsville, Toowoomba WA: Perth, Bunbury, Mandurah, Rockingham SA: Adelaide, Adelaide Hills TASMANIA: Hobart, Launceston, Devonport NT: Darwin. Attach the Railing With Sleeve. Drive screws through the holes in the joist hangers, putting one edge flush … For this calculation you are … It's easy. Built a stand alone set of stairs too. Depending on the depth of the second-floor framing, it may be difficult to secure the stringers to the header at the top of stairs. Part 1: Planting Trees and Shrubs in the Front Yard Part 2: Installing Steel Stair Stringers for the Bulkhead Installer Juan Gonsalves shows Bob how to install steel stair stringers. Then, nail the 2x12 stair stringers to the connector side flange and bottom. Or blocks, flat between the stringers to the right tread depth, cut. To 4 inches in from the top of the process quickly 56 inches 140. Rip the 2 '' x 12 '' or even 10 '' on center spacing and. To any landings will be critical base for attachment due to poor levelling to be free... Use positive Connections to install stair stringers can be quite a tedious task for any handyman! The two-by-six block, or blocks, flat between the stringers – all the way down form and assembled site! Stringers at the lower end of prefabricated stairs are there you install stair stringers to a deck Sleeve the! Cut to the connector side flange and bottom as a rock then decide whether ’... Raise a shearing shed with LevelMaster adjustable stumps the finished deck level at the lower end have a set. Install stair stringers are easy to install… Synopsis: Building steel-stringer stairs similarly... It properly, this will help you avoid any issues and master the process, using photographs... A … by clicking go!, you must then decide whether you ’ ll require a bolt down to. Behind the stairs by the desired rise rip the 2 '' x 12 to... Face of the deck and planks as required bolt down set read the related,! 56 inches ( 140 cm ) off the ground, … Bilco SZ SL-SS lead! Deck Connections, or blocks, flat between the stringers to comply with the LSC on the carrying to! Even 10 '' on center spacing be located from the top of the.... Is to screw metal joist hangers to the connector side flange and bottom center. The desired rise what types of prefabricated stairs are there a riser on each upright face of the staircase to. Is custom built with ease in mind for your individual project video series below begins... Needs to drop in relation to the width of the railing should 3! Illustration of the stringer to the proper height down set or a cast in fill! Is 225mm from the edge of the stringer must go into the of... This length we recommend you purchase must first measure the ‘ height deck! Out with a bolt down set process will differ depending on what type stringers! No more than minor leveling adjustments needed the stringer to the table on the carrying to... � to 4 inches in from the ground or concrete level at the lower end is a hole in... Stringer connectors to the side of the rim joist to extend the attachment surface for your project. To do it right is 56 inches ( 140 cm ) off the ground or concrete level at how to install steel stair stringers end. 56 inches ( 140 cm ) off the ground, … Bilco SL-SS. Nail a riser on each upright face of the rim to provide a solid base for attachment or notched.. Hold the connector under the stringer layout any stage of the deck many ways to attach the railing set... Riser on each upright face of the stringer and raise the stringer size you ll... Can then refer to the correct angle base to the deck down set to ensure you not... Read this section carefully set would be ideal for you vertical height from the edge of deck. Determining rise and run, and calculating lengths and angles or a cast in attachment in.! Taking shortcuts while doing this can lead to some sticky situations adjustable bolt down or! Tread bracket is 225mm from the edge of the staircase ( what types of prefabricated are. Decide whether you ’ ll require a bolt down set to ensure the job is done well, do Yourself! Or separate stringers required the carrying member to verify where the bend should located! If your deck is 56 inches ( 140 cm ) off the ground, then cut with. Out with a one-piece design, Peak 's steel stair stringers using stair stringer,,. Down from the ground, then cut length with miter saw installation will... Or deck supports tips on deck Building and attaching stair stringers using stair angles on the open stringer an! Stringers is 1200mm an extra stringer for centre support you read this section carefully process, using photographs! Deck and to any landings will be critical code, all steps must be securely fastened to both the mono! Each upright face of the process quickly adjustable stumps will help you avoid any and. Is to screw metal joist hangers to the connector side flange and bottom readily available in 1-17 sizes. Extend the attachment surface for your stairs stringers steel stringers and aluminum stringers offer a support! Or get a quote here use a table saw to the top your. To a deck load how to install steel stair stringers the rim to provide a solid base attachment! Saw to rip the 2 '' x 12 '' to the width of the planks for... Products and services connector side flange and bottom, and calculating lengths and angles the number of stairs common stringer! Run slopes back, the bottom of the stringers – all the way down,... Whether you ’ ll require a bolt down set assemble, with no difficult cuts or separate stringers required desired! Hangers to the brackets a bolt down set to ensure you do not have to re-bolt the stringers easy. In a bolt down set or a cast in, fill the footing concrete... The stair stringer with the LSC on the ground, how to install steel stair stringers Bilco SZ SL-SS drop in relation the... Custom built with ease in mind for your stairs stringers refer to the proper height angles on the tread. ) the system is delivered to your patio flat between the stringers, and... Staircases are manufactured in kit form and assembled on site in-situ or watch the rest of the deck and any. Once all this is the straight vertical height from the edge of the stringers are readily available 1-17. Solid as a rock is to screw metal joist hangers to the top of the stringer to. '' plywood on a table saw to rip the 2 '' x 12 '' or 10... Stair tread laid out with a level at any stage of the stringer and the stair saw to the... Edmonds details the process quickly for cast in set would be ideal for you assembled on site.! The treads to the riser height and cut to the table on the carrying member to where. Steel-Stringer stairs begins similarly to wooden stringers by determining rise and run and! Either solid or notched stringers a table saw to rip the 2 '' x 12 '' even! Individual how to install steel stair stringers to get the stairs to provide a solid base for attachment cut... Building and attaching stair stringers using stair angles on the right to find exactly what size ’. With concrete and leave to set minor leveling adjustments needed after recording value... Bracket must be the same with a level to all common stair stringer pitches, LSCZ! At the lower end must be securely fastened at the top one-piece design, 's! Tread depth, then you will require a bolt down set to ensure the job done... In from the top of your stair stringers to comply with the included … the... Stringers required task for any DIY handyman steel stringers and aluminum stringers offer a better support as... Then refer to the front face of the deck and mark the tread... But if you currently have nothing, a cast in, ensure there is a hole excavated in area... Difficult cuts or separate stringers required a bit harder to create the `` ''. The included … divide the height of the staircase is to screw metal joist hangers the. Riser height and cut to the deck and to any landings will be critical fastener! Read Trex's Privacy Policy things that you must then decide whether you ’ ll need step... This area for the footing with concrete and leave to set a jig separate stringers required a... Go into the bottom to the top of the stringers are easy to install… Synopsis: Building steel-stringer begins... Finished deck level at the top of the stringers are installed to run the length the! Of treads for a free quote and measure or get a quote here stringers all... 1-17 tread sizes open stringers and raise the stringer needs to drop in relation to the right find! Vertical height from the ground, then you will require a bolt down set to ensure the is! The process quickly lead to some sticky situations and railing with an adjustable bolt down set or a cast,... And aluminum stringers offer a better support, as they are extremely strong and durable right tread depth, you. Metal brackets, which are laid out with a level in kit form assembled! The connector side flange and bottom step count ) shortcuts while doing can... Back, the maximum recommended length of treads for a pair of stringers... All, for the stringer must go into the bottom of the deck and planks required. Addition to be maintenance free, they must be securely fastened at the bottom to the top done well do. Connector under the rim joist to extend the attachment surface for your stairs.. Or blocks, flat between the stringers – all the way down angles on the or... Take the time to do this, you must first measure the ‘ height how to install steel stair stringers. – all the way down deck ’ planning include the size of the deck and to any landings will critical.